Logo
DOWNLOAD FREE TRIAL
Submit a request
Sign in
  1. NRG Global Help Center
  2. FAQ
  3. AppLoader Questions

AppLoader Questions

Select an FAQ below.

  • How to backup and restore the AppLoader Controller data?
  • How to create a new test plan in AppLoader Controller?
  • How to analyze load test failures?
  • How to use ScenarioBuilder Web RDP?
  • Is it possible to have pausing between iterations during a load test?
  • What are the system requirements for AppLoader?
  • What is the difference between sequential and parallel testing?
  • Manage Execution Flows in AppLoader Controller
  • Manage Test Plans in AppLoader Controller
  • How to use rUserManager?
  • How to define and start rUsers through the Controller?
  • How to queue rUsers tasks to prevent resource issues during a load test?
  • Is it possible to use domain accounts for the remote sessions inside rUserManager instead of locally created rUsers?
  • How to send Test Scenarios from the AppLoader Controller to the Injector?
  • How can I compare results of load test runs?
  • Is there a difference between what I can analyze during a running load test versus a completed load test?
  • Can I view and analyze load tests that ran previously?
  • Why is my load test running slow? What should I do?
  • What does "Enforce SST" mean when creating a Test Plan?
  • rUsers cannot be started in rUserManager. Why?
  • Are there any ports that need to be opened in Windows firewall for the AppLoader Controller and the Injector?
  • Is it possible to schedule a load test with AppLoader?
  • How many virtual users can be simulated by the Injector?
  • What does the VStation do?
  • What is Injector?
  • What is AppLoader Controller?
©2017 Load testing tools | Application Testing Software | NRG Global. All Rights Reserved.